Raven River

After Replacement

Before Replacement

Securing required environmental permits was quite difficult.  MPA negotiated extensively on behalf of the Client to ensure a reasonable product was delivered. Bridge alignment and construction issues arose on account of sharp skew angle.  MPA pursued economical alternatives to alleviate bearing issues created by the less than ideal geometry required by the site constraints.

Roles and Responsibilities: Design, Tender Preparation and Management, Construction Supervision, Post Construction

Project Details

Location: Caroline, Alberta

Original Structure: Three span (6.1-8.5-6.1 m) "PA" type precast concrete girders on a treated timber substructure.

Replacement Structure: Three span (6-8-6 m) "SL" type prestressed concrete girders on a steel substructure.

Tanya Camp

I am a graphic designer and website developer with 24+ years of professional experience. My background is in visual communication design with a Bachelor of Fine Arts degree and a diploma in New Media Design from the University of Alberta. My focus includes print design, identity systems, marketing design, user experience, usability, and website design. I enjoy collaborating and developing custom-fit solutions, focusing on highly usable yet visually beautiful deliverables.

https://www.bucketduck.com
Previous
Previous

Lasthill Creek

Next
Next

Tributary to the North Saskatchewan River