Mission Creek

After Replacement

Before Replacement

MPA effectively implemented the use of standard bridge details and components to construct a “standard” bridge with a non-standard pedestrian sidewalk and handrail.

The location of the stream crossing is in a rural area and is sandwiched between summer residences to the west, a DFO pier to the east and a functioning marina to the north. The bridge design has to accommodate a higher gradeline in order to satisfy NWPA and the towns future plans of expanding the marina upstream of the bridge while tieing into the existing approaches and parking area to the northeast.

Roles and responsibilities: Design, Tender Preparation and Management, Construction Supervision, Post Construction

Project Details

Location: Joussard, Alberta

Original Structure: 3 - 6.1 m long treated timber spans, built on a treated timber substructure.

Replacement Structure: 3 - 8.0 m long "SL-510" type pre-stressed concrete girder bridge on a galvanized steel substructure (24 m total length) with a pedestrian sidewalk and handrail.

Tanya Camp

I am a graphic designer and website developer with 24+ years of professional experience. My background is in visual communication design with a Bachelor of Fine Arts degree and a diploma in New Media Design from the University of Alberta. My focus includes print design, identity systems, marketing design, user experience, usability, and website design. I enjoy collaborating and developing custom-fit solutions, focusing on highly usable yet visually beautiful deliverables.

https://www.bucketduck.com
Previous
Previous

Northern Sunrise County RR211

Next
Next

Wolf Creek