Wolf Creek

Before Replacement

After Replacement

The previous bridge at this location had reached the end of its service life, was hydraulically inadequate and required replacement.  MPA completed the bridge planning and geometric design for the new bridge structure and 600 m of gradeline revisions to tie into the new deck height which increased by 3 m over the old structure.  MPA’s structural sub-consultant (DIALOG) completed the structural design for the complicated 45 degree skew and semi-integral abutments.

Wolf Creek is a class “A” watercourse with a lengthy in-stream restricted activity period and securing environmental permits and an appropriate in-stream work window proved challenging.  In addition, negotiations with landowners proved difficult but MPA secured the necessary right-of-way to allow the project to proceed.

Roles and Responsibilities: Design, Tender Preparation and Management, Construction Supervision, Post Construction

Project Details

Location: Edson, Alberta

Original Structure: Three span 11.3 m SM - 27.4 RB - 27.4 RB bridge on concrete and steel substructure.

Replacement Structure: Three span (21-28-21 m) Steel Girders on steel and concrete substructure with a cast-in-place concrete deck. 3 m grade raise with 500 m of vertical gradeline revisions (ACP). Relocation of landowner approaches.

Tanya Camp

I am a graphic designer and website developer with 24+ years of professional experience. My background is in visual communication design with a Bachelor of Fine Arts degree and a diploma in New Media Design from the University of Alberta. My focus includes print design, identity systems, marketing design, user experience, usability, and website design. I enjoy collaborating and developing custom-fit solutions, focusing on highly usable yet visually beautiful deliverables.

https://www.bucketduck.com
Previous
Previous

Mission Creek

Next
Next

Montagneuse River